Echo GT-225i User Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
GT-225 ASSEMBLY
X7722273204 13
© 04/2013 ECHO Inc.
ASSEMBLY
Plastic Shield Installaion
Cut-off knife on debris shield has sharp edges. Avoid contact when installing or removing line head.
Wear Gloves or personal injury may result:
Cutoff knife is sharp.
Gearcase and surrounding area may be hot.
1. Remove wing nut (A), washer (B), and bolt (C).
2. Snap the shield over the bearing housing.
3. Install bolt (C), washer (B), and wing nut (A).
Nylon Line Head Installation
1. Remove plastic threaded shaft sleeve from threaded PTO
shaft.
2. Align locating hole in upper plate with hole in bearing
housing and insert locking tool (A).
3. Place large washer (B) then line head (C) on threaded shaft,
followed by small metal washer (D) and locknut (E).
4. Install locknut. Turn locknut clockwise, and tighten securely.
Remember to remove the locking tool.
Parts Required: Rapid LoaderTM Head, Large washer,
Small washer, 3/8-24 Locknut, (2) Pre-cut
Nylon Line 8 in. x .080 in., Plastic Shield
Assemblys.
A
B
C
A
B
C
E
D
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 31 32

Comments to this Manuals

No comments