SHRED 'N' VAC®Operator's ManualMODEL ES-210X75300237012/04X7531135400WARNING DANGERRead rules for safe operation and all instructio
10DE5. Align grooves in discharge elbow with pegs on blower, and slideelbow (D) on to blower. Turn elbow counterclockwise to lock inplace. Elbow mus
11SHRED 'N' VAC®OPERATOR'S MANUALoitaR1:05-xiMliOotleuF.S.UCIRTEMSAGLIOSAGLIOsnollaG.zo.lFretiL.cc1256.22.531480208061004IMPORTANTSpill
12OPERATIONSTARTING COLD ENGINE1. Stop SwitchMove stop switch button (A) away from the STOP position.2. Throttle Position LeverMove throttle position
13SHRED 'N' VAC®OPERATOR'S MANUALSTARTING WARM ENGINEThe starting procedure is the same as Cold Start except DO NOT closethe choke.1. S
14BLOWER OPERATIONWARNING DANGERAlways wear safety glasses, hearing protection and a face filtermask or serious personal injury may result.Do not
15SHRED 'N' VAC®OPERATOR'S MANUALSHRED ‘N’ VAC® OPERATIONWARNING DANGERFlying debris hazard. Never operate unit as a vacuum unless
16MAINTENANCEYour ECHO blower is designed to provide many hours of trouble free service. Regular scheduled maintenance will helpyour blower achieve th
17SHRED 'N' VAC®OPERATOR'S MANUALAIR FILTERLevel 1.Tools required: 25-50 mm (1-2 in.) cleaning brush.Parts required: 90008 REPOWERTM Ai
180.65 mm(0.026 in.)SPARK PLUGLevel 2.Tools required: T-Wrench, Feeler gaugeParts Required: REPOWERTM Tune-Up Kit P/N 900741. Remove spark plug and ch
19SHRED 'N' VAC®OPERATOR'S MANUALEXHAUST SYSTEMSpark Arrestor ScreenLevel 2.Tools required: Cross Head Screwdriver, 3 mm Hex Wrench, so
2TABLE OF CONTENTSIntroduction ... 2- The Operator's Manual ...
20Cylinder Exhaust PortLevel 3.IMPORTANTThe cylinder exhaust port must be inspected and cleaned of excesscarbon every 3 months or 90 hours of operatio
21SHRED 'N' VAC®OPERATOR'S MANUALABCARBURETOR ADJUSTMENTEngine Break-InNew engines must be operated a minimum duration of two tanks of
22WARNING DANGERFuel vapors are extremely flammable and may cause fire and/or explosion. Never test for ignition spark by ground-ing spark plug n
23SHRED 'N' VAC®OPERATOR'S MANUALSTORAGEWARNING DANGERDuring operation the muffler or catalytic muffler and surrounding cover become
ECHO, INCORPORATED400 Oakwood RoadLake Zurich, IL 60047-1564www.echo-usa.comSERVICING INFORMATIONPARTSGenuine ECHO Parts and ECHO REPOWER™ Parts and
3SHRED 'N' VAC®OPERATOR'S MANUALIMPORTANTThe enclosed message providesinformation necessary for the protectionof the unit.NOTEThis encl
4WARNING DANGERSHRED ‘N’ VAC® users risk injury to themselves and others if the SHRED ‘N’ VAC® is used improperly and/orsafety precautions are not
5SHRED 'N' VAC®OPERATOR'S MANUALEQUIPMENT• Check unit for loose/missing nuts, bolts and screws. Tightenand/or replace as needed.• Inspe
6IMPORTANT ENGINE INFORMATIONENGINE FAMILY: 5EHXS.0214KG DISPLACEMENT: 21.2 ccEMISSION COMPLIANCE PERIOD: 300 HoursTHIS ENGINE MEETS U.S. EPA PH2 AN
7SHRED 'N' VAC®OPERATOR'S MANUAL1235678910111241314DESCRIPTIONCONTENTS__ 1 - Power Head__ 1 - Straight Pipe__ 1 - Pipe with Nozzle__ 1
813. DEBRIS BAG - Collects shredded material.14. BLOWER PIPES - Twist lock design.15. PRIMER BULB - Pumping primer bulb before starting engine draws f
9SHRED 'N' VAC®OPERATOR'S MANUALAASSEMBLYRequired Tools: ScrewdriverWARNING DANGERNever perform maintenance or assembly procedures
Comments to this Manuals